This guideline lays out the expectations for submitting documentation from a Project Site to the Head Office.

Document    When to submit

Weekly Record of Site Safety Activity
Hard Copy or PolyNet

Weekly
by 9:00 AM on the
1st working day of the week

Trade and/or Site Safety Meeting Minutes
Appendix K or equivalent

Same Day or as soon as possible

Safety Violation Notice
Hard Copy or PolyNet

Same Day

Incident Investigation
(Preliminary or Full)
Polygon or Contractor Investigation

upon Completion or
when received from Contractor

WorkSafeBC Inspection Reports

upon Receipt

Ways to Submit

The following methods can be used to submit safety documentation to the Head Office

PolyNet (preferred)

Submitting details and attachments via PolyNet is the preferred method as it reduces duplication of effort.

Email

Documentation can be scanned or imaged and emailed to safety@polyhomes.com. If you are emailing you should use the “Delivery Receipt requested” feature of MS Outlook or request a reply confirming receipt in the body of the message.

If internet communication is not possible from your location or there is another issue;

Call the Safety Manager at (604) 871-4248